Sunday, April 27, 2008

Reno Update ... 26th Apr 2008 …

26th is supposed to be the handover date from the ID to me... But alas... so delay in the carpentry work... So the handover date is being pushed to 29th... Hopefully all went well...

Went to the reno site on 26th...

Here's an update.... The lightings are all up, including all the points... The toilets are also completed, with the rain shower in, the glass door installed.... Saw lots of drawers on the floor, waiting to be installed... They are for the TV console, study table and the walk-in wardrobe...

The sliding door to the kitchen is up... Plan to buy some decal to "decorate" the door... Realised that there will be a hole between the kitchen and the living room... Had chk with my ID on wat we shld to abt it.. Not her fault... The hole is due to the "stupid" design of the kitchen by our housing govt... Hope there is a remedy.... Else, no choice... Guess we can still live with the hole... Ke ke ke, afterall I dun cook that much =P The study room is 90% completed... Now only left the drawers for the study table to be installed... Loved our study room =P

Our master bedroom is also near completion... the wall shelves and side tables are completed... All drawers in... Even the featured wall is completed... Now only left the walk-in wardrobe... the frame of the sliding door is up.. Now only pending the glass panel and the full mirror behind the door... The drawers are only installed halfway... Jia you, workers .... =P


The master carpenter is supposed to handover the hse to my ID tomorrow, on the 28th... Hope that materialized... I'll be praying hard... Will be dropping by the new hse after work tom... Hope I see what I wanna to see... Then i'll get my hse on 29th =P

So looking forward to it =P