Went to the reno site on 26th...
Here's an update.... The lightings are all up, including all the points... The toilets are also completed, with the rain shower in, the glass door installed.... Saw lots of drawers on the floor, waiting to be installed... They are for the TV console, study table and the walk-in wardrobe...

The sliding door to the kitchen is up... Plan to buy some decal to "decorate" the door... Realised that there will be a hole between the kitchen and the living room... Had chk with my ID on wat we shld to abt it.. Not her fault... The hole is due to the "stupid" design of the kitchen by our housing govt... Hope there is a remedy.... Else, no choice... Guess we can still live with the hole... Ke ke ke, afterall I dun cook that much =P The study room is 90% completed... Now only left the drawers for the study table to be installed... Loved our study room =P

Our master bedroom is also near completion... the wall shelves and side tables are completed... All drawers in... Even the featured wall is completed... Now only left the walk-in wardrobe... the frame of the sliding door is up.. Now only pending the glass panel and the full mirror behind the door... The drawers are only installed halfway... Jia you, workers .... =P


So looking forward to it =P
No comments:
Post a Comment